Joint gap risk and shared exposure
Compare planned stop loss with disclosed hypothetical account shocks without pretending to estimate correlation, tail probability or a guaranteed maximum.
Reproduce whole-unit stop-budget sizing, verify downward rounding and inspect funding and shared exposure as separate constraints.
Educational risk arithmetic, not personal sizing advice. Stops do not guarantee fills. Stress inputs are invented assumptions without assigned probabilities; margin, shorts and derivatives need their own contracts.
A size calculation begins with a declared monetary budget and an instrument contract. If a fraction creates the budget, name its denominator: marked account equity, settled cash or another documented value. A fraction detached from its denominator cannot be inspected. This guide does not select an appropriate percentage for a person. The budget entered in the example is fictional and chosen only to make the arithmetic reproducible.
Identify entry and planned exit prices, value per price unit, currency and minimum quantity increment. A share and a futures contract do not share the same point value. FX quantities and option combinations need their own contracts rather than relabelled share units. Check whether the price difference is signed or absolute within the supported lane. Missing fields should leave the result unresolved, not silently introduce a familiar contract specification from memory.
Take invented cash-funded long shares, starting cash 10,000, budget 100, entry 50, planned stop 48 and additional cost 0.10 per share. Planned loss per share is 2.10. The whole-share quantity is floor(100/2.10), or forty-seven, with planned loss 98.70. Forty-eight shares would cost 100.80 under the same stop assumption, so rounding up violates the stated budget.
The conservative entry-funding figure here is forty-seven times (50+0.10), or 2,354.70, allocating all entered extra costs at funding time. That convention is deliberately explicit; actual fee timing requires the account contract. All money uses one consistent currency. The calculation assumes the planned exit price, not a guaranteed fill. Store both requested and accepted quantities so a later report cannot claim that a larger requested position was approved by this formula.
For a permissible increment delta, the generic downward-rounding expression is floor(budget/(loss per unit times delta)) times delta. The unit contract must justify delta and whether fractional quantities are supported. A tiny epsilon that moves a near-boundary ratio upward can create a budget breach. Prefer stable monetary or decimal arithmetic where appropriate, then verify accepted quantity times declared per-unit loss is no greater than the entered budget.
If the result falls below the instrument's minimum quantity, report no accepted size under the supplied contract. Do not convert zero accepted units into one simply to create a trade. Display formatting comes after acceptance and must not alter it. Test exact boundaries, just-above and just-below boundaries, invalid increments and blank inputs. These fixtures test arithmetic behaviour; they do not establish liquidity, broker acceptance or the appropriateness of the underlying budget.
A quantity can fit a planned stop budget and still exceed available funding or other account limits. Name the account lane before checking entry notional. Cash-funded long shares are different from margin loans, short sales and derivatives. A broker's margin requirement is a funding constraint, not a maximum possible loss. Current terms and applicable account rules must be checked against primary sources and the actual agreement.
Inspect existing positions and pending orders before accepting another instruction. Separate gross quantity, common underlying exposure and simultaneous loss scenarios. Do not assume differently named models diversify each other. A netted total can hide obligations or execution mismatches, and an invented two-position shock cannot estimate covariance. Keep requested size, stop-budget size, funding-limited size and finally accepted size as different fields so the reader can identify which constraint actually determined the instruction.
If entry and exit prices are executable ask and bid prices, their difference already contains the spread treatment. Extra commissions or other charges must be genuinely additional. If prices are midpoints, document the separate spread and delay assumptions. Fees expressed per order rather than per unit change the sizing equation; minimum commissions can make a simple linear formula inappropriate. Record the actual fee contract before using it.
A gap beyond the planned stop can increase realised loss without changing quantity. An assumed exit is a stress input, not a measured probability or loss ceiling. Partial fills require individual executed quantities and prices; unfilled quantity has no entry exposure until a report establishes it. A provider conviction label is not an independently calibrated winning probability and cannot choose personal size. This guide contains no recommended leverage, universal risk fraction or live-account calculation.
Save the budget denominator, instrument contract, formula version, intermediate values, accepted quantity and evidence references. A later addition, reduction or changed stop is a new position-state event. Recalculate the joint contract when an authorised change takes effect rather than silently preserving an obsolete green result. For an operating service, reconcile instructions against broker reports and active cloud policy evidence.
Use the blank size-audit record to reproduce the forty-seven-share example and then document a real contract if available. Leave unsupported multipliers, account terms or costs unresolved rather than inventing them. Software correctness, live order acceptance and strategy validation remain separate findings. A reader should be able to explain why a quantity was accepted and what risk dimensions the formula did not cover; a single large number labelled maximum position does not provide that explanation.
| Object | Preserve | Do not infer |
|---|---|---|
| Units | Denominator, point value and increment | All instruments use the share formula |
| Rounding | Unformatted accepted quantity and recheck | Nearest rounding preserves the budget |
| Constraints | Funding, exposure and execution separately | A stop-budget size is automatically tradable |
Download blank review record (CSV)
Headers only. No trades, subscriber outcomes or operating receipts are supplied.
Documentation establishes the stated mechanism, not tested trading performance. Checked 10 October 2026; a later version can differ.
Compare planned stop loss with disclosed hypothetical account shocks without pretending to estimate correlation, tail probability or a guaranteed maximum.
Keep account currency, position increments, original risk, recovery percentages and deposits separate before drawing conclusions from a risk statistic.
Turn a risk formula into a versioned policy with ownership, funding checks, monitoring, exceptions and durable cloud evidence.
The retained accepted-increment and funding protocol remains complete. The new workbook tests three positions under a single cash base, because individually accepted quantities can still create excessive joint exposure. It does not recommend changing the reader's budget or quantify dependence from different symbols. Reproduce the quantity under the original price, multiplier, cost and rounding convention, then separately assess account funding, remaining orders and shared stress. A later favourable fill or chart cannot retroactively repair a missing input.
The invented long-share packet uses 8,410 cash including its additional costs and has a 220 joint planned reference. Under deeper joint exits its loss becomes 650 while the quantities stay unchanged. Correct sizing arithmetic has not bounded that larger scenario. The comparison does not include borrowing or derivatives, and no scenario is assigned a probability. It shows why a single-position budget result is only one stage in a portfolio risk review, not an independently validated account-control policy.